The project launched.
What changed?

Build a post-implementation review your client can act on. Compare the original objectives with the evidence, capture lessons and agree the follow-up. Start with a Practice template and shape the report through conversation.

Build your post-implementation review

Free to use · No account required · PDF & Word downloads

Download the editable Word template

Start with your brief.

Describe the client situation and the evidence you have. The guide asks for the details needed to shape your document.

Make the pages your own.

Use the starting template, then change the writing, tables, diagrams and page layout through conversation.

Take a useful document away.

Apply the changes you want and download a designed PDF or editable Word version. Review it before using it with a client.

The method

What is a
post-implementation review?

A post-implementation review examines what happened after a project or change went live. It compares intended outcomes with available evidence, records lessons and unresolved issues, and helps the sponsor decide what to improve or review next. Delivery milestones and benefits are assessed separately: launching a system does not show that it is being used well.

  1. 01

    Set the review question and period.

    Record the project scope, launch date, original objectives and the decision the sponsor needs to make. Choose a review point that allows the relevant outcomes to be observed; some benefits need later follow-up.

  2. 02

    Compare intentions with actual evidence.

    For each objective, record the original baseline and target, the observed result, its period and its source. Keep missing measurements visible. Check that comparisons use consistent definitions and populations.

  3. 03

    Separate findings, explanations and lessons.

    Distinguish what the records show from possible reasons for it. Consider unintended effects, remaining operational issues and other changes that may explain the results. An estimate or before/after difference does not by itself prove savings or causation.

  4. 04

    Agree actions and the next decision.

    Turn material findings into proposed actions with owners, timing and completion checks. State which benefits still need measurement and who will review them. Leave approval open until the sponsor agrees.

Worked example / Post-implementation review

Northbank: the CRM launched, but are the benefits reaching the team?

A consultant reviews a fictional CRM rollout at Northbank Advisory, 12 weeks after go-live. The system launched on its planned date. The sponsor wanted consistent client handoffs, weekly use by at least 24 of 30 account managers by week 12, and less time preparing pipeline reports. The findings below are illustrative supplied evidence, not real client results.

Prepared by Practice. Fictional teaching example; not client data or achieved results.

The client questionShould the sponsor close the project, or keep a bounded improvement and benefits-review plan open?

Post-implementation review: the working record
Objective and original targetEvidence at week 12Review judgement and proposed next step
Launch on the agreed date.Project record reports launch on the planned date. Final implementation cost was not supplied.Timing achieved as reported. Budget performance remains unknown; this does not establish adoption or benefits.
At least 24 of 30 account managers use the CRM weekly by week 12.Usage export records 18 of 30 users during week 12. It measures logins, not completed client handoffs.Weekly usage is below the stated target. Inspect representative handoffs before judging effective adoption.
Reduce weekly pipeline-report preparation from a recorded baseline of four hours to two hours by week 12.Operations estimates three hours for the week-12 report; no comparable time log has been collected.The estimate suggests progress, but target achievement and sustained savings are not established. Log the same reporting tasks for four weeks.
Create consistent client handoffs; no numerical target supplied.A consultant reviewed 20 handoffs from weeks 9–12; seven lacked the agreed next-action field. Sampling method was not supplied.A gap is evidenced in the reviewed sample. Do not apply that rate to all handoffs or infer a training cause. Inspect the workflow with users.
Retire duplicate reporting; original deadline not supplied.The operations lead reports that the weekly pipeline spreadsheet is still maintained.Confirm why it remains necessary before changing the process. Retirement is a proposed decision, not an agreed or completed action.

Keep delivery and benefits separate.

The launch date answers whether a milestone was met. It does not answer whether the team is using the workflow or whether reporting has improved. The usage record shows 18 weekly users against a target of 24, both out of 30. Even reaching that target would establish recorded usage, not complete or accurate client work.

Explain what each source can support.

The reporting estimate and historical baseline may have been collected differently, so they cannot establish a verified time saving. The handoff review identifies seven omissions among 20 reviewed records; it does not establish the rate across the firm. Ask how records were selected and whether the required field and review standard were consistent.

Turn findings into small, testable actions.

Propose that the CRM owner and operations lead inspect five recent handoffs with users in the next fortnight, then agree whether the response is workflow, access, guidance or training. Ask operations to record reporting effort for four weeks. These are suggested roles and timings for sponsor approval, not existing commitments or proof of the cause.

The next client decision

Ask the sponsor to approve a four-week follow-up: confirm action owners, examine the incomplete handoffs, gather comparable reporting-time evidence and review meaningful use. Keep benefits ownership open until the sponsor has enough evidence to decide on closure. Do not describe the whole project as a failure or claim verified ROI.

Download the full example (HTML)Download the example table (CSV)

Read the HTML copy in your browser or print it to PDF. The CSV contains the table, ready to adapt in a spreadsheet.

What to bring to your own review

  • The original project objectives, agreed targets, go-live date and review period.
  • Usage records, work samples, cost records and feedback, with sources and known limitations.
  • The sponsor decision needed, existing action owners and benefits that require later follow-up.

A mistake to avoid

Treating a successful launch as proof of benefits, turning login counts into effective adoption, or presenting an estimate as verified savings.

Further method guidance: Department of Finance: post-programme or project review. These references explain the method; they do not validate the fictional case or endorse this tool.

Use the free post-implementation review tool

Check what the project delivered

Open the targets you recorded in the Business Case Builder on this browser, then add actual results and evidence for the review.

Open the benefits tracker in Business Case Builder →

Jump to results

Record the measurements

Benefit 1

Your draft stays in this browser. Download a copy to share it.

Benefits review

Your results will appear here as you add items.

    Before you begin

    A few useful
    answers.

    You can download the Word template directly or open the builder and start with a short description.

    What should a post-implementation review report include?

    Include the review purpose and period, original objectives, baseline and targets, actual delivery and operational results, evidence sources, limitations, lessons, unresolved issues and follow-up actions. End with the sponsor decision and any later benefits-review date. The Word template and builder provide these sections.

    When should we run the review?

    Choose the timing around the outcomes you need to observe. An early review can examine launch and operational problems; sustained adoption or business benefits may need a later review. Agree the period with the sponsor rather than assume that every project should be reviewed after the same number of weeks.

    How is this different from a retrospective or project closure report?

    A retrospective often focuses on how a team worked and what it can improve. A closure report records delivery and handover. This builder focuses on what happened after implementation, including whether intended outcomes are evidenced and what remains to be done. The activities can inform each other.

    What if we do not have a baseline or benefits data?

    The guide can build an incomplete review with those gaps clearly marked and help plan the next measurement. It should not invent a baseline, claim ROI or mark a benefit achieved because the system launched. Supply the records you have and identify estimates explicitly.

    Is this for regulatory post-implementation reviews?

    This tool is designed for client projects, systems rollouts and organisational changes. It is not a statutory regulatory review template or a compliance assessment.

    What can the AI change?

    The guide works with the actual document pages. It can propose new writing, tables, diagrams, page layouts or page order. Preview its changes, then apply them or keep the current document. You can undo an applied update.

    What can I download?

    Download a PDF that preserves the designed pages or a Word document with editable text and tables. Word uses simpler formatting and includes diagrams as figures. Downloads contain the applied document and exclude the chat. The free starting Word template is available above.

    Where are my draft and conversation saved?

    The current draft and recent conversation are saved on this device for up to seven days. Each tool has its own draft. Sending a message shares the document and recent chat with DeepSeek through DeepInfra for AI processing. Leave out confidential or personal information. Download your document to keep a copy.

    How do I use this work in Practice?