Museum of everyday culture
Retain the guide.
The director sees visitors stopping near the entrance and asks whether a second ticket desk is needed. Review one entrance and the first ten minutes of arrival. Keep the assisted route available, preserve staffing and avoid permanent building work.
The evidence that changes the discussion
Visible friction could look like a ticketing problem, yet orientation requests outnumber ticket requests 36 to 14. This weakens the ticket-desk explanation; it does not prove every delay is caused by signage.
The decision
Retain the reversible arrival guide for four weeks. Do not approve the second ticket desk from this evidence.
Inspect the reasoning and next action
Orientation requests fell from 35% to 15% across the two conditions, an observed 20-point difference against a 10-point criterion. Revised-route unresolved enquiries were 5%, within the 10% limit. The £650 spend is below £900 and the assisted route was checked. Together these justify a bounded continuation, not a permanent investment or causal claim.
Next action. Mira reviews another 80 arriving groups by 2 March 2027. Stop or revise if the assisted route is obstructed or unresolved enquiries exceed the agreed limit. Any permanent fit-out requires a separate capacity and access study.
Limits. Only 80 groups across four non-randomised windows. Time of day, visitor mix and staff behaviour may differ. Unresolved enquiries and orientation requests can overlap and must not be added as unique groups. Assisted-request counts do not demonstrate equitable access.
Retrospective review under v2; pilot rules were recorded before the pilot on 20 January.
Read the complete worked application
Professional learning provider
Defer the launch.
The commercial team has 18 expressions of interest in an advanced course and positive satisfaction results. Decide whether to open bookings for a new cohort in April or first repair the existing programme. Review four completed cohorts and the associated support log.
The evidence that changes the discussion
72/78 respondents are positive (92.3%), but only 64/120 enrolled learners passed (53.3%). These are different denominators and outcomes. Positive sentiment cannot substitute for evidence that learners completed the assessed outcome.
The decision
Defer the advanced-course launch. Repair assessment clarity and support ownership, then review fresh outcome evidence.
Inspect the reasoning and next action
The two agreed conditions are not met: a 53.3% pass rate versus 75%, and 70% timely responses versus 90%. Interest and satisfaction are useful but cannot offset those conditions. A 24-learner repair cohort is a smaller commitment than a new product launch.
Next action. Elias assigns a facilitator to rewrite the assessment brief and a support owner to triage questions. Review the next 24 learners on 9 April 2027: at least 18 must pass, and at least 90% of actual support requests must receive a timely response. With zero requests, support performance remains untested. Do not open bookings until both measures and reviewer sign-off are recorded.
Limits. Four constructed cohorts are not a controlled study. There is no demonstrated cause for the completion gap and no validated demand forecast. The repair cohort is a plan, not a completed result. The 24-learner rule is illustrative and does not establish statistical certainty.
Prospective use of v2 for a portfolio decision; the recommended repair test has not yet run.
Read the complete worked application